Operations

Argentina - Gualcamayo | Argentina (100% Yamana-owned)

The Gualcamayo mine, located in San Juan province, is an open pit, heap leach operation encompassing three substantial zones of gold mineralization (QDD, AIM and QDD Lower West). An expansion of the operation, to be completed by mid-2013, is expected to increase sustainable production to approximately 200,000 gold ounces per year beginning in 2014.

 

The increase in production will result from the transition of mining to the Phase III section of the QDD Main pit, starting in mid-2013, as well as from the start-up of the AIM open pit and the development of the QDD Lower West underground operation. Recent exploration indicating increasing amounts of sulphide ore in mineral resources prompted a scoping study that is evaluating milling this higher grade material rather than treating it by heap leaching.

Production 2012A* 2013E 2014E
Gold (oz.) 147,310 170-185,000 190-210,000
*preliminary result

Mineral Reserves and Mineral Resources (as at Dec. 31, 2012)

Gold 2.1 million oz. proven & probable + 1.2 million oz. measured & indicated

Strategic Mine Life: 7 years

* Please refer to www.yamana.com/Operations/ReservesAndResources for complete information relating to mineral reserves and mineral resources indicating tonnage and grade for the various mines and projects.
Type of operation: Open-pit gold mine